← All work07 / SYSTEMS & ANALYSIS
Baby shampoo bottle · manufacturing system design

From bottle to production line.

A systems design exercise connecting a product with the processes, resources and constraints needed to manufacture it.

CONTRIBUTION

Team research & system design project

CONTEXT

ISE 402 · manufacturing system design

METHODS

Process design / Facility planning / Cost & quality analysis

Cover of a manufacturing system design for an HDPE baby shampoo bottle production line
01 / THE QUESTION

How do material, process and facility decisions fit together in a manufacturing system?

02 / THE OBSERVATION

Choosing a production process also means considering quality, cost, material recovery and the arrangement of work.

03 / THE APPROACH
  1. 01

    Examined HDPE as the material and extrusion blow moulding as the production process.

  2. 02

    Developed the manufacturing-system proposal around production, facility and quality requirements.

  3. 03

    Considered recycling and operational cost as part of the wider design.

04 / WHAT CAME OUT OF IT

A system design report bringing together material choice, manufacturing process and operational requirements.

05 / A REFLECTION

This project extends the same habit of connecting decisions across scales: from a product detail to the system that makes it possible.

THE WORKING FILESDownload the design report↗
NEXT PROJECT / ForecastingReading change over time↗